4x4 treated posts are
lag-bolted to the rim joists of the deck. Additional blocking
is added to prevent the posts from flexing too much. Post
spacing problems are discussed. |
Related
Articles:
|
Skill Level:
2-3 (Basic to Intermediate) |
Time Taken:
About 8 Hours |
By
Bruce W. Maki,
Editor
While building an extension for an existing deck, I was asked to
install a new synthetic handrail product around the perimeter of the
new and improved deck. The original deck had treated wood deck
boards, which had already been replaced prior to the installation of
a hot tub.
This synthetic PVC handrail system uses post sleeves that slide
over an ordinary 4x4 treated post. The steps shown in this article
should also apply to any handrail method that employs 4x4 posts to
support railings or guards.
 |
This is the deck extension after the
framing was complete. |
|
For the handrail posts I used 4-foot-long
treated 4x4's.
I clamped the post to the rim joist, then inserted plastic-composite
shims to make the post plumb. I didn't want to use
ordinary shims because they may rot eventually, allowing
the posts to become loose. |
 |
|
 |
Fastening Handrail Posts To
Deck Framing:
I drove a pair of GRK 5/16 x 4" lag
screws through the rim joist into the post. On the
corners I used 4 lag screws. |
|
 |
Two of the handrail posts were installed
on the part of the deck that already had the new deck
boards installed. I had to remove one piece of deck
material.
Since the post landed right on the gap between boards
I made a notch with a jig saw. |
|
I clamped the post to the rim joist, used
shims to make the post plumb, and drove in a pair of
4-inch lag
screws. |
 |
|
 |
I noticed that the post could wiggle
inwards and outwards, because the entire joist was
flexing. To remedy this, I wedged a piece of 2x8
blocking between the joists and secured it with 3-inch deck
screws. This made a big difference. |
|
Post Spacing Problems:
The 24-foot long side of the deck needed 4 sections of handrail,
and 5 posts. I installed the corner posts first, then measured the
distance between the posts. But simply dividing this distance by 4 does
not give me the proper post spacing, because there are 3
intermediate posts (each 3½" wide) included in this distance.
So I deducted 10½" (3½" times 3) from the measurement, and then
I divided by 4 to determine the spacing between posts.
I marked the handrail locations on the rim joist. All of the post
locations landed on an open space between the joists...
except one. One post overlapped a joist by one-quarter of an inch.
That post needed to have a 1/4" deep notch made in the side.
The Joy Of Expensive
Power Tools:
In the past I've done this with a circular saw, but
now I have this expensive slide miter saw, which
makes short work of this task.
This photo shows me making the deep longitudinal cut
all the way through the 4x4 post. |
 |
|
 |
Then I made the shallow cross-cut to lop
off the thin slab. |
|
This is what the post looked like after
being installed. |
 |
|
 |
One of the other posts landed midway
between the ends of the joists. This post could flex a
bit more than the others, so I added a piece of blocking
behind it. |
|
The deck framing after all the posts were
mounted to the rim joists.
The 24'-long edge is on the left side of the picture.
|
 |
|
 |
Another photo from a different angle. |
|
 |
I slipped a couple of post sleeves over
the posts to see what they looked like. |
|
Continue to: Installing
Synthetic Handrails, Part 2.
Tools
Used:
- Cordless Impact Driver
- Basic Carpentry Tools
- 12" Bar Clamps
- Miter Saw (Slide Miter Saw
Is Optional)
- 4' Level
|
Materials Used:
- Treated 4x4, 4' Long
- Treated 2x8 Blocking
- Synthetic (Composite)
Shims
- 3" Deck Screws
|